The moving truck showed up today on the Illinois house. The Sachse house is now about a week behind due to all the rain. Right now we don’t have a final closing date but hoping for sometime before Memorial Day weekend. I was able to walk through it and get a few updated photos.
Our Subdivision We have concrete and graded today! 12 and 14 foot ceilings mean extra tall front door. I am guessing 9 feet tall.
Office Doors are finished.
All tray ceilings are done.
Light fixtures are in and plastic off the windows Trim around the island Finally a gas cooktop after 12 years of electric Built in Microwave and oven
Pool goes in this corner of the yard
The hardwood was covered with paper, but this closet wasn’t covered.
Laundry room still missing base cabinet and counter top.
Our pool for the summer of 2015, five houses down the street.
Hopefully we will be able to limit the numbers of nights in the hotel. More in the adventure to come.
Life is good and I am blessed!
Kent